West Yorkshire Combined Authority / Pilot Learner Destinations System

Tender Summary

Working notes compiled section by section from the WYCA Statement of Requirements (RFQ ref 111675) — Destinations Survey. Focus on the Data & Analytics scope.

Key facts at a glance
Client
West Yorkshire Combined Authority
Budget
Up to £35,000 excl. VAT
Evaluation
50% quality / 50% cost
Population
~14,500 learners (adults 19+)
Submission deadline
Noon, 20 Jul 2026
Delivery window
Aug 2026 – Sept 2027
① Summary

Rest of the section is scene-setting boilerplate (transport, housing, sister programmes) — not scope.

② Background
③ Objective
💾
Data dependency flag: value for money needs cost-per-learner-by-provision data from WYCA. The survey does not capture this — it must be sourced separately.
④ Requirements
⚠
Risk to name in the bid: Learning Provider data quality and timeliness can stall the whole survey pipeline. The Timescales section explicitly asks how risks and delays are identified and managed.
⑤ Deliverables

Four contractual outputs. Each maps 1:1 onto a paid milestone, so every deliverable is a paid gate. Three of the four are yours or heavily data-led; only the inception paper is shared PM work.

D1 — Inception paper

D2 — Shareable dashboard

D3 — Final report (the £-weighted, highest-bar deliverable)

D4 — Roll-out recommendations & methodology

⚠
Cross-cutting risk: the final report's three-way cut (outcome × provider × provision) multiplies the number of cells while the matched-pair sample stays fixed, so several cells may be too thin to report confidently. This is the single biggest threat to the "statistically robust" bar and must be pre-empted in the methodology and inception paper.
⑥ Reporting requirements

A brief for how the final report must look and land. Plays directly to data-visualisation strengths and is a genuine differentiator on the 50% quality score.

Audience & purpose

Mandatory format

💡
Bid angle: resolve the rigour-vs-accessibility tension by layering — headline visuals up front, statistical detail in annexes — and say so in the methodology. On a 50% quality score where rivals may be equally competent statistically, impactful communication is the edge. Consider showcasing a sample one-pager / infographic approach.
⑦ Liaison arrangements

Only two things matter for pricing: (1) "bi-weekly" is ambiguous — likely fortnightly, worth an enquiry to WYCA; (2) in-person sessions over ~13 months carry travel cost/time — reflect in pricing and propose a sensible virtual/in-person split.

⑧ Timings
MilestoneDate
Statement releasedw/c 6 Jul 2026
Deadline for enquiriesNoon, 14 Jul 2026
Closing time (deadline for submission of tenders)Noon, 20 Jul 2026
Tender evaluationw/c 20 Jul 2026
Contract awardw/c 20 Jul 2026
Contract start (estimated) and inception meetingw/c 3 Aug 2026
Inception paperSeptember 2026
Dashboard operationalOctober 2026
Final report and presentationSeptember 2027
⑨ Budget & payment schedule
DeliveryDeadlinePayment
Inception paperSeptember 202630%
Operational dashboardOctober 202620%
Submission of final reportSeptember 202750%
⑩ Submission instructions
Required proposal sectionWeight
Insight & Methodology15%
Resources15%
Timescales5%
Quality Control15%
Budget50%
⑪ Evaluation criteria

Three qualifying criteria the consultant had to meet.

📘
Green & Magenta Books (HM Treasury guidance):
  • Green Book — appraisal and evaluation; the value-for-money lens (is the provision worth the money?).
  • Magenta Book — evaluation method; the how (robustly measuring and attributing the outcomes). Underpins the matched-pair design and the statistical rigour.
⑫ Data protection & security

Constrains how the data platform may be built and hosted.

Framing

Security standards that bite for a cloud data platform

The full table has 13 rows; the postal / paper / physical-asset controls are omitted here as not relevant to the build.

🏗
Architecture implications: keep all processing and storage UK-region (Fabric / Azure) to sidestep international-transfer obligations; cloud-only, no local copies; MFA everywhere; the platform must be defensible against the NCSC 14 Cloud Security Principles. Expect to support a DPIA and sign up to WYCA's DP Appendix.
Section tracker
Summary Covered
Background Covered
Objective Covered
Requirements Covered
Deliverables Covered
Reporting requirements Covered
Liaison arrangements Covered
Timings Covered
Budget & payment schedule Covered
Submission instructions Covered
Evaluation criteria Covered
Data protection & security Covered

Source: _context\Statement of Requirements\111675 Procurement - Destinations Survey Statement of Requirements.docx